Normally, there will be postings as a days work has gone by but - as this is the first entries - there has been a couple of days work. So, we'll try and cover everything completed so far.
Firstly, we decided what we wanted to do with the garden. As the previous blog showed, the area is mostly grass and this isn't very pretty and hard to maintain. We made the decision to take areas and lift the turf and put stones down and a walkway up the side of our house to the garden. The thought was that we could make the grass squarer, a smaller area and therefore musch easier to look after. Remember, we aren't used to maintaining a garden. So, the first jobs to complete were digging out the areas that were to be "paved". So, on 3rd/4th July a fork was taken to the ground up the side of the house to clear away all the weeds and try and get the ground clear for the process. What a job that turned out to be...
Purchased so far:
Fork - $11
Jute twine - $2
Weedkiller - $17
Gloves - $5
Existing tools:
Shovel
Rake
Trowel
Also, we did a recon to Home Depot to get prices for the pathway. The plan is to tamp the ground (rent an electric tamper), put down weed-proof breathable material, add sand and flatten and then add stones and slabs to creat a walkway.
Not much has been done but it seemed like a lot of work.